Mobile Energy Storage Test Equipment

time2024-07-16
parameters

Application areas: The

portable Energy Storage Products

including: FCT test system

ATE Test System

safety test system

aging test system

Product features:

  • Strong compatibility, support AC-AC, AC-DC, DC-AC, DC-DC testing;
  • Support various fast charging protocols;
  • Support product communication: CAN, RS485;
  • Modular system architecture for easy maintenance and quick replacement;
  • Support scanning code to automatically retrieve test programs and upload test data to MES system;
  • The unique instrument debugging and maintenance function is convenient for testing engineering personnel to maintain and adjust equipment, and can simulate manual testing;
  • The open elastic architecture software platform can customize test projects according to the customer's new product requirements;
  • Test results automatically produce various test reports and statistical analysis;

System Introduction

This equipment is used to realize the automatic test of insulation, total pressure, core pressure difference, DCIR, charging and discharging communication and other functions of energy storage system. The equipment mainly includes CAN card, charging and discharging motor, insulation withstand voltage meter, multimeter, relay switching system, supporting electric control system and upper computer software. The equipment automatically discriminates qualified and unqualified products according to the requirements of the test project, automatically records and saves the test data, and uploads it to the MES system. It can realize the matching of upstream and downstream production capacity of equipment to meet the needs of production process.

Application Industry

Used for industrial and commercial outdoor energy storage, home storage products three-in-one offline test equipment, functional modules: photovoltaic grid load;

Basic functions: solar panel charging test, inverter charging and discharging test, inverter communication test, EMS test.

移动储能测试设备1

移动储能测试设备2

移动储能测试设备3

Test Item

No.

Test Item

Test Method

Test Equipment

lower limit

Upper Limit

Unit

1

Insulation withstand voltage test

Measure the insulation resistance between the positive and negative electrodes and the shell (ground). 2000VDC, 5S

Safety gauge

500

infinity

2

BMU Software/Hardware Version

Whether BMU software/hardware version is OK

CAN card

N/A

N/A

N/A

3

CSC Software/Hardware Version

Whether CSC software/hardware version is OK

CAN card

N/A

N/A

N/A

4

EMS Software/Hardware Version

Whether EMS software/hardware version is OK

CAN card

N/A

N/A

N/A

5

Serial Number Write/Read

EMS and product serial number

6

Inverter Communication Protocol Test

485 or CAN communication test

Communication Module

7

Relay Test

CAN or 485 communication control relay is closed or disconnected, and the corresponding output signal is tested.

Communication module multimeter

8

AC internal resistance

Measure AC internal resistance between total positive and total negative

Internal resistance meter

9

Total pressure test

Measure total pressure between total positive and total negative

Multimeter

400

1500

V

10

Maximum and minimum cell voltage difference

CAN message

CAN card

0

25

mV

11

Maximum and minimum cell temperature difference

CAN message

CAN card

0

3

12

Current calibration

Calculation of K value and B value based on current value and measured current value of BMS

Charging and discharging motor

13

Current direction

Charge and discharge motor current direction is consistent with BMS direction

Charging and discharging motor

14

Current calibration

Calibrate the BMS current value against the actual current value

Charging and discharging motor

15

Quiescent current (when closed)

Test the quiescent current of the system

Multimeter

16

High pressure pre-charge test

17

Photovoltaic charging test

Photovoltaic simulator access simulation photovoltaic charging

Photovoltaic Simulator

18

Charging DCIR

Charging internal resistance (60%-70% SOC 1C charge 10s)

Charging and discharging motor

55

70

19

Discharge DCIR

Discharge internal resistance (60%-70% SOC 1C duscharge 10s)

Charging and discharging motor

55

70

20

Charge and discharge test

The maximum current (300A) charging 3min, test the pressure difference, battery temperature rise, copper bar temperature rise, relay temperature rise;

The maximum current (300A) is discharged for 3min, and the differential pressure, cell temperature rise, copper bar temperature rise and relay temperature rise are tested.

Charging and discharging motor CAN card

21

static pressure difference

Read the cell voltage of the message under static state, and calculate the differential pressure

CAN card

0

10

mV

22

Discharge differential pressure

<= 200mV

Charging and discharging motor CAN card

0

200

mV

23

AC on-load test

Maximum 100kw with load, test voltage and current

Power Grid Simulator

0

100

Kw

24

AC charging test

Connect to the mains to charge the product, test voltage, current, maximum 100kw

Power Grid Simulator

0

100

Kw

25

Cloud platform data upload

The corresponding data is uploaded to the cloud platform through Ethernet/WiFi, and the specific method is to be confirmed.

26

Wireless Test

WIFI hotspot (2.4G5G), Bluetooth connection access, distribution network and configuration test;

WiFi Module Bluetooth Module

27

DIO Short Circuit Control Output Test

Provide at least 10 routes

DIO Module

28

DIN input test

The input level supports short-circuit signal and 12V/24V voltage signal (at least 10 channels are provided)

DIO Module

29

system power control

TBD

Power supply, load, CAN card

30

power quality test

TBD

power analyzer

31

Voltage/Frequency Response Test

TBD

Oscilloscope

32

Overload capacity test

TBD

Power supply, load

33

Protection function test

TBD

Fault simulation module, CAN card

34

Low Voltage Ride Through Capability Test

TBD

TBD

35

DBC file import parsing

TBD

TBD

Previous articlewithout
Next articlePower Ate Test System